The provisions of §§ 190-6 and 190-7 of Article II shall be applicable in the event that the volume of material to be excavated, fill deposited or topsoil removed shall exceed 40 cubic yards if the excavated material is to be removed from the premises or fill is to be brought onto the premises from outside the boundaries thereof or 1,000 cubic yards if the excavation or deposit of fill is the result of a grading operation limited to the premises [in each case without considering material removed pursuant to exception under Subsection B(1) of the definition of "excavation" in § 190-2] or, if topsoil is to be removed, the amount thereof is less than 4,000 square feet and in such other cases as, in the discretion of the Building Inspector and/or Planning Board, bond is required.
Amended 1-22-2013 by L.L. No. 1-2013
var val = document.getElementById('citecontent').innerHTML;
art.dialog.defaults.title = window.location.href;
art.dialog.data('cite', val);
art.dialog.data('homeDemoPath', '/Scripts/plus/artDialog/');
art.dialog.open('/Scripts/plus/artDialog/citeiframe.html');